Our Pumps ‘n Pipeline (PnP) users have often requested an intensive masterclass, so now is your chance! In three hours, you can learn to create your own suction and discharge production estimates or at the very least understand the physical limitations and associated risks of hydraulic transport. Professionals worldwide find our PnP tool easy to […]
Determining Soil-Water Mixture Viscosity
In order to determine suction and discharge production, successfully characterising soil-mixture viscosity can be key. The latest version of Pumps ‘n Pipeline (PnP), i.e., v1.6.9, can simulate any soil-water mixture in order to estimate production. It can also help users identify and enter the right mixture properties. Water viscosity is only relevant for medium to […]
Major Update of Pumps ‘n Pipeline (PnP) v1.6.8
Pumps ‘n Pipeline (PnP) v1.6.8, a suction and discharge production estimation tool, has had a major update. PnP was first released four years ago in 2016 and its functionality and features have steadily grown over the last few years. This year PnP underwent a major update to include some of our PnP user’s requests. The […]
How to Easily Estimate Dredging Production
Here are a few tips on how you can easily estimate the suction and discharge production of dredging and mining equipment yourself. It is easier than it looks! Taking the time to learn how to do this could save you millions of dollars down the line. Creating your own estimate will also greatly increase your […]
How to Accurately Estimate Suction Production
A few years ago, in2Dredging developed the Pumps ‘n Pipeline (PnP) estimating tool, which can be used to accurately estimate suction and discharge production. In this post, PnP’s results are introduced chronologically, so as to help describe how suction production rates can be estimated more accurately. PnP has already been explained at a high-level in […]
Pump and Soil-Mixture Parameters to Consider
Are you estimating pump production for your dredging or mining project? A growing number of dredging and mining professionals rely on Pumps ‘n Pipeline (PnP) for their production estimates. The estimating software program PnP v1.4 now has more features to help you accurately estimate production for various soil mixtures and pump installations. The new features […]
i2D Shortlisted for DPC Dredging Innovation Awards 2017
in2Dredging (i2D) is shortlisted in three categories of DPC Magazine’s Dredging Innovation Awards, for our commercial off-the-shelf dredging tools, Pumps ‘n Pipeline (PnP) and Equipment Performance Review (EPR). i2D has been nominated in the following categories: Innovation in Project Design – for EPR Innovative Support Services – for PnP New Markets Award – for […]
PnP v1.2 Released with New Tutorials
in2Dredging (i2D) releases a new series of online tutorials whilst launching version 1.2 of Pumps ‘n Pipeline (PnP). PnP version 1.1 was launched nine months ago and received significant international attention. Feedback from this first release has now been incorporated into PnP v1.2, which includes new capabilities that have been thoroughly tested. In addition, PnP’s […]
i2D launches unique tool PnP v1.1
Today in2Dredging (i2D) launches its new and unique software program Pumps ‘n Pipeline (PnP v1.1). PnP is the first commercial pumps and pipeline estimating tool for the dredging and mining industry. i2D’s gap analysis identified a disconnection between project performances and production estimates. The PnP tool can optimize the use of equipment, benchmark production levels, […]
How does Pumps and Pipeline Estimating Tool Work?
How Pumps and Pipeline Estimating Tool Works Recently, in2Dredging developed Pumps and Pipeline (PnP) estimating tool that can accurately estimate the suction and discharge production of any dredging or mining equipment that hydraulically transports soil like materials. In this post, the results of PnP are chronologically introduced to explain on a high level how PnP works. It […]